top of page

Devoran park access improvements

The pathways in Devoran park have now been able to be finished and the fencing has been removed. The stepping logs up the side of the slide are now also ready for use to climb up the bank to get to the slide and slide down!

There is a non slip varnish on the tops of these stepping logs to make them less slippery. The logs are designed to be different heights to make play more challenging for children and have been installed to give an alternative way to get up the bank to the top of the slide, which we hope will be more fun for the children than just the concrete steps!

Recent Posts
bottom of page