Material for footpath on old A39

July 8, 2016

Here is a sample of the material we will be laying on the new footpath on the grass verge which runs up the side of the old A39. It is hoped that this will provide a longer lasting surface than the current compacted surface. 

 

 

Please reload

Featured Posts

Missing your library?

March 28, 2020

1/10
Please reload

Recent Posts

March 28, 2020

February 12, 2020

Please reload

Follow Us
Please reload